Scenari di Pericolosità e Danno SPeeD PROJECT -TASK 1.1 Connection of the “Centri Funzionali” of DPC and RC to the monitoring system of INGV-OV
Author(s)
Type
Poster session
Language
English
Obiettivo Specifico
1.4. TTC - Sorveglianza sismologica delle aree vulcaniche attive
Status
Unpublished
Date Issued
July 6, 2010
Conference Location
Roma
Sponsors
INGV;DPC
Subjects
Abstract
Project specifications;
•Server design & realization for the management of the multiparametric data,alarm and notifications provided by the OV-INGV monitoring system...
•Server design & realization for the management of the multiparametric data,alarm and notifications provided by the OV-INGV monitoring system...
File(s)![]()
Name
Poster_Paroxysm_ScarpatoEtAl.pdf
Size
398.92 KB
Format
Adobe PDF
Checksum (MD5)
The MD5 message-digest algorithm can be used to verify the integrity of the file that you have uploaded. You can calculate its value locally via tools that are generally available in each operative system like md5sum
2cd85d48b950fe79fc04147d390f77ba
