Skip to main content
The search returned 2 results
Now showing 1 - 2 of 2
  • Some of the metrics are blocked by your 
    Item type:Publication, Access status: Open Access ,

    Application of a prioritisation scheme for seismic intervention in schools buildings in Italy

    A risk management framework has recently been developed to assign priorities for the rehabilitation of school buildings in Italy, and to give timescales within which retrofit or demolition must take place. Since it is not practical to carry out a detailed assessment of the 60,000 Italian state and public schools, the framework is a multiple-level procedure which aims to identify the highest-risk buildings based on filters of increasing detail, and reduces the size of the building inventory at each step. The first risk ranking is based on a strength deficit, which measures the difference between the current design forces defined for the building site and an estimation of the level of seismic resistance which was required at the time of design. The second ranking is based on lateral strength calculations that are already available for a large portion of the Italian masonry building stock, and that are obtained from a survey form that is familiar to Italian engineers. Finally, a simplified displacement-based methodology is used to give a more accurate assessment of seismic risk based on a limited amount of geometrical and material data. The final assessment leads to a capacity ratio and a risk rating, which are used within a transparent procedure to assign priorities for seismic intervention, and timescales within which detailed assessment leading to retrofit or demolition must take place. The first step of the methodology has been applied herein to the school building stock within two Regions in Italy and preliminary results are presented.
      213  321
  • Some of the metrics are blocked by your 
    Item type:Publication, Access status: Open Access ,

    Ampliamento del sito web per la disseminazione dei dati del progetto S1

    One of the main requirements by OPCM 3274 was the transparency of the PSH assessment (to be achieved through the publication of the procedure adopted and the data used) so that anyone would be able to verify the consistency of the results and follow the most updated state-of-the-art. In addition, OPCM 3519 stated that the seismic hazard data had to be made officially available through a dedicated website (http://zonesismiche.mi.ingv.it). The web site supplies the seismic hazard data expressed in terms of peak ground acceleration (ag) with 10% of exceedance probability in 50 years as well as their variability stated in terms of the 16th and 84th percentiles. In addition, the same website can supply even the scientific technical documentation as well as the input data used in such a project. As integration of these contents, a second web site (http://esse1.mi.ingv.it) has been developed with the aim to make available all the information about the organization of the S1 project (work program, tasks organization, list of the deliverables, progress state), underlying the most important results and for an immediate fruition by the project endusers. For this purpose a webGis tool has been carried out to visualize and query interactive hazard maps of the Italian territory, represented through various shaking parameters (values of peak ground acceleration and elastic response spectra for a given T period).
      246  354