Options
Di Pasquale, G.
Loading...
Preferred name
Di Pasquale, G.
2 results
Now showing 1 - 2 of 2
- PublicationOpen AccessSisma Molise 2002: il percorso della ricostruzione(2007-06-10)
; ; ; ; ; ; ; ; ; ; ; ; ; ; ;Di Grezia, V.; Regione Molise, Struttura del Commissario delegato per la Ricostruzione Post-Sisma 2002, Campobasso ;Baranello, S.; Regione Molise, Struttura del Commissario delegato per la Ricostruzione Post-Sisma 2002, Campobasso ;Lemme, A.; Regione Molise, Struttura del Commissario delegato per la Ricostruzione Post-Sisma 2002, Campobasso ;Pasquale, C.; Regione Molise, Struttura del Commissario delegato per la Ricostruzione Post-Sisma 2002, Campobasso ;Dolce, M.; Dipartimento della Protezione Civile, Ufficio Valutazione, prevenzione e mitigazione del rischio sismico e attività ed opere post-emergenza, Roma ;Di Pasquale, G.; Dipartimento della Protezione Civile, Ufficio Valutazione, prevenzione e mitigazione del rischio sismico e attività ed opere post-emergenza, Roma ;Pizza, A. G.; Dipartimento della Protezione Civile, Ufficio Valutazione, prevenzione e mitigazione del rischio sismico e attività ed opere post-emergenza, Roma ;Eva, C.; Università di Genova, DIPTERIS, Genova ;Lagomarsino, S.; Università di Genova, DICAT, Genova ;Podestà, S.; Università di Genova, DICAT, Genova ;Di Capua, G.; Istituto Nazionale di Geofisica e Vulcanologia, Sezione AC, Roma, Italia ;Peppoloni, S.; Istituto Nazionale di Geofisica e Vulcanologia, Sezione Roma1, Roma, Italia ;Cifani, G.; CNR, ITC, L'Aquila ;Martinelli, A.; CNR, ITC, L'Aquila; ; ; ; ; ; ; ; ; ; ; ; ; The job illustrates the activities, the normative and procedural dispositions of the reconstruction in Molise that has been on its way after the 2002 earthquake. The individualized run has been characterized by numerous technical innovations, consequent to the emanation of the new seismic code (OPCM n. 3274/2003). The President of the Region, Delegated Commissioner for the reconstruction after-earthquake 2002, has programmed and coordinated all the activities, using structures of consultation, of address and of technical support. Particularly, the Scientific Technical Committee (CTS) has taken care of the containing directives, the criterions and the general norms for the trial of the reconstruction, emanate through the Ordinance of the Delegated Commissioner n. 13/2003. The Committee for the Microzonation (CMS) has predisposed indications and guidelines, while the CNR Institute for the Technologies of the Construction, in collaboration with the University of Basilicata and Dicat-University of Genoa, has up the guidelines for the investigations of vulnerability and for the interventions on the scholastic buildings, on the churches and on the monumental buildings. Finally, the Delegated Commissioner has ordered that the Local Corporate Bodies were made themselves responsible for the reconstruction realization. In the Campobasso province , with exception of the S.Giuliano diPuglia common, have been compiled about 16.200 preliminary projects (PPS). It is esteemed a general economic requirement of about 1.800 million of Euros for the residential buildings and of about 900 million of Euros for the public works. The reconstruction is in advanced realization and involves the buildings affected by an evacuation measure (Priority A).207 767 - PublicationOpen AccessSeismic hazard data for the new, Italian building code based on European standard(2006)
; ; ; ; ; ; ; ; ;Montaldo, V.; Istituto Nazionale di Geofisica e Vulcanologia, Sezione Milano-Pavia, Milano, Italia ;Meletti, C.; Istituto Nazionale di Geofisica e Vulcanologia, Sezione Milano-Pavia, Milano, Italia ;Stucchi, M.; Istituto Nazionale di Geofisica e Vulcanologia, Sezione Milano-Pavia, Milano, Italia ;Faccioli, E.; Politecnico di Milano, Dipartimento di Ingegneria Strutturale ;Calvi, G.; Università di Pavia, Dipartimento di Meccanica Strutturale ;Boschi, E.; Istituto Nazionale di Geofisica e Vulcanologia, Sezione AC, Roma, Italia ;Di Pasquale, G.; DPC, Ufficio Servizio Sismico Nazionale ;Gomez Capera, A. A.; Istituto Nazionale di Geofisica e Vulcanologia, Sezione Milano-Pavia, Milano, Italia; ; ; ; ; ; ; Prior to 2003 the Italian building code, established in 1974, was mostly based on working stress design. The zonation that guided its application was made up in 1981 using a semi-quantitative, mainly seismological approach; it was enforced in 1984 and left about 2/3 of the territory without seismic provisions. In 1998 a new zonation was proposed but never adopted. The 2002 Mw5.7 earthquake in Molise (Southern Italy) caused the collapse of a school and the death of 26 children. The school was built in an area where seismic provisions were not applied, although the zonation proposed in 1998 assigned it to the second zone. The earthquake triggered a process that led in a few months to a new set of seismic provisions202 780